Project Timeline (8 Dec 2017)
Project Timeline (8 Dec 2017)
Project Timeline (8 Dec 2017)
Flight date: 3 May 2018 / 9 October 2018
Flight date: 3 May 2018 / 9 October 2018
Drone-based roof inspections, photography, filming, istructural nspections, surveys, 2D mapping & 3D modelling
Building Key
Please note:
there are 3 runs of the relevant rooves to cover both sides of gable windows plus the main pitched roof 'head on', although not all the images are included on this page due to volume of images, unless they show a potential issue not revealed by an included shot.
images run largely in order (see image key above) so you can follow the flight path across each roof / section
Building A Inspection Images (Garden Side)
Building A (Garden) Potential Issues Spotted - none
Building A Inspection Images (Far Side)
Building A Inspection Images (Far Side / Left)
Building A (Far Side / Left) Potential Issues Spotted
Building A (Far Side / Left) Potential Issues locations
Building A Inspection Images (Central Flat Roof)
Building A Inspection Images (Courtyard)
Building A (Courtyard) Potential Issues Spotted
Building A (Courtyard) / Left) Potential Issues locations
Building A Inspection Images (Tree Side))
Building A (Tree(s)/line) Potential Issues Spotted
Building A (Tree(s) / Line Potential Issues locations
Please note: while we do highlight anything we spot in flight and potentially take images from other angles / heights, we do NOT guarantee to spot every issue with a roof or other. It remains the responsibility of the client to review the images themselves or with an appropriately qualified & experienced third party (surveyor, roofing contractor or other).