top of page
Project Timeline (8 Dec 2017)
Project Timeline (8 Dec 2017)
Project Timeline (8 Dec 2017)
Windows Photo Viewer Wallpaper (2)
DJI_0009.MOV.00_08_34_07.Still006-2
Windows Photo Viewer Wallpaper (2)
DJI_0009.MOV.00_08_34_07.Still006-2
Windows Photo Viewer Wallpaper (2)
DJI_0009.MOV.00_08_34_07.Still006-2
Flight date: 3 May 2018 / 9 October 2018
Flight date: 3 May 2018 / 9 October 2018
Drone-based roof inspections, photography, filming, istructural nspections, surveys, 2D mapping & 3D modelling
KEBLE COLLEGE, OXFORD | roof survey / inspection
Building List
Home / Index
Building 1*
Building 2
Building 3*
Building 4*
Building 5*
Building 6*
Building 7
Building 8
Building 9*
Items with a * are those items where potential issues have been identified
Building 1 overview
Building 1 images of note & their location
Building 1 inspection images
DJI_0021.MOV.00_00_37_13.Still004-3
DJI_0021.MOV.00_02_42_20.Still001
DJI_0021.MOV.00_01_22_00.Still010
DJI_0021.MOV.00_02_13_00.Still005
DJI_0021.MOV.00_02_34_00.Still007
DJI_0021.MOV.00_00_37_13.Still004-3
DJI_0021.MOV.00_02_42_20.Still001
DJI_0021.MOV.00_01_22_00.Still010
DJI_0021.MOV.00_02_13_00.Still005
DJI_0021.MOV.00_02_34_00.Still007
Building 1 sample image
Building 9 sample image
bottom of page