top of page
Project Timeline (8 Dec 2017)
Project Timeline (8 Dec 2017)
Project Timeline (8 Dec 2017)
Windows Photo Viewer Wallpaper (2)
DJI_0009.MOV.00_08_34_07.Still006-2
Windows Photo Viewer Wallpaper (2)
DJI_0009.MOV.00_08_34_07.Still006-2
Windows Photo Viewer Wallpaper (2)
DJI_0009.MOV.00_08_34_07.Still006-2
Flight date: 3 May 2018 / 9 October 2018
Flight date: 3 May 2018 / 9 October 2018
Drone-based roof inspections, photography, filming, istructural nspections, surveys, 2D mapping & 3D modelling
KEBLE COLLEGE, OXFORD | roof survey / inspection
Building List
Home / Index
Building 1*
Building 2
Building 3*
Building 4*
Building 5*
Building 6*
Building 7
Building 8
Building 9*
Items with a * are those items where potential issues have been identified
Building 4 overview
Building 4 images of note & their location
Building 4 inspection images
DJI_0078.MOV.00_00_33_00.Still001
DJI_0078.MOV.00_01_36_23.Still002
DJI_0078.MOV.00_00_22_00.Still002
DJI_0078.MOV.00_00_09_00.Still001
DJI_0077.MOV.00_04_11_08.Still009
DJI_0077.MOV.00_02_36_07.Still007
DJI_0077.MOV.00_03_59_08.Still008
DJI_0077.MOV.00_02_09_07.Still006
DJI_0077.MOV.00_00_33_02.Still001
DJI_0077.MOV.00_01_57_00.Still005
DJI_0077.MOV.00_01_38_03.Still004
DJI_0077.MOV.00_01_29_02.Still002
Building 4 sample image
Building 9 sample image