top of page
Project Timeline (8 Dec 2017)
Project Timeline (8 Dec 2017)
Project Timeline (8 Dec 2017)
Windows Photo Viewer Wallpaper (2)
DJI_0009.MOV.00_08_34_07.Still006-2
Windows Photo Viewer Wallpaper (2)
DJI_0009.MOV.00_08_34_07.Still006-2
Windows Photo Viewer Wallpaper (2)
DJI_0009.MOV.00_08_34_07.Still006-2
Flight date: 3 May 2018 / 9 October 2018
Flight date: 3 May 2018 / 9 October 2018
Drone-based roof inspections, photography, filming, istructural nspections, surveys, 2D mapping & 3D modelling
KEBLE COLLEGE, OXFORD | roof survey / inspection
Building List
Home / Index
Building 1*
Building 2
Building 3*
Building 4*
Building 5*
Building 6*
Building 7
Building 8
Building 9*
Items with a * are those items where potential issues have been identified
Building 5 overview
Building 5 images of note & their location
DJI_0008.MOV.00_01_16_17.Still002MU
DJI_0008.MOV.00_01_12_00.Still002CU
DJI_0008.MOV.00_01_12_00.Still002CU
Building 5 inspection images
Building 5 sample image
Building 9 sample image
bottom of page